Quantity, exposure and margin are three different answers.
A stop-distance formula is a starting scenario calculation. Costs, quantity increments, buying power and contract mechanics decide whether its result is usable.
By the end: Calculate linear-unit quantity, reserve for costs, round down to increments and preserve the distinction between planned loss and execution risk.
For an ordinary linear position quoted in one currency, gross planned loss = quantity × absolute(entry − assumed exit). Rearranging gives quantity = gross loss budget ÷ price distance. The result is base-asset units, not automatically a cash amount, margin amount or number of arbitrary contracts.
For a short, use a higher adverse exit and the same absolute distance. A zero stop distance makes division undefined. Inverse contracts, options and contracts with multipliers require their own payout rules rather than blindly applying this base-unit formula.
| Item | Value |
|---|---|
| Loss budget | 100 |
| Distance per unit | 5 |
| Quantity | 20 |
| Loss at assumed exit | 100 before costs |
| Item | Value |
|---|---|
| Total planned budget | 100 |
| Assumed total cost reserve | 10 |
| Price-move budget | 90 |
| Quantity | 90 ÷ 5 = 18 |
| Exposure at entry 100 | 1,800 |
The cost-reserved example assumes 10 total quote units separately; it does not claim costs stay fixed as size changes. In a real model, fees can depend on entry/exit notionals and the fee tier, while slippage can grow with size and volatility. Re-evaluate the reserve and quantity together. An allowance cannot guarantee the actual cost or fill.
At a 100 gross budget and price distance 1,500, quantity is 0.066666… units. Rounding up to 0.0667 gives gross planned loss 100.05; at a 0.0001 quantity step, rounding down to 0.0666 gives 99.90. A displayed rounded number can quietly exceed the intended budget.
Check minimum quantity, step size, tick size and minimum order value. If the feasible minimum is larger than the budget permits, the calculation does not authorise exceeding it. A different feasible plan—or no trade—is needed. Fees and slippage remain additional checks after rounding.
| Stop distance | Calculated quantity | Notional at entry |
|---|---|---|
| 500 | 0.2 units | 16,000 |
| 5,000 | 0.02 units | 1,600 |
For a fixed budget, a tighter stop produces a larger calculated quantity, not a smaller one. The 16,000 exposure is infeasible in a 10,000 unleveraged cash account. Do not assume buying power, or move a stop closer solely to obtain a large quantity. Normal price variation can cross an unrealistically tight boundary.
These qualifications preserve the earlier corrected lesson: choose a defensible scenario, then constrain quantity by capital, liquidity, order rules and the account’s combined exposure.
Maya: “The calculator says 16,000. My account only has 10,000. Has it found free money?”
Leo: “It found an unconstrained quantity. Buying power still gets a vote.”
For the same linear quantity and fill prices, gross profit/loss is unchanged when the margin setting changes. A simple notional/leverage calculation estimates initial collateral only; maintenance requirements, funding, fees and liquidation must also be checked. There is no automatically safe leverage multiple or guaranteed loss cap.
Use the Bitcoin overview for asset context, not a contract specification. Confirm the actual instrument’s multiplier, settlement currency and collateral rules. Recalculate when entry, quantity, stop, available equity or costs change, and include all open positions.
(60 − 10) ÷ 2 = 25 units, before applying quantity increments and feasibility constraints. The reserve is an assumption, not a guaranteed fee or slippage cap.
Not in the ordinary linear model. It changes collateral and liquidation exposure; additional funding, costs and product rules can change the actual result.
Primary references for the concepts above. Examples are simplified teaching illustrations, not live quotes or recommendations.
Reviewed 24 October 2026 · Educational purposes only. Not financial advice.
Next read Leverage Explained and stop-order execution before treating a calculated quantity as a complete plan.